What information do I need to send for an accurate roll forming machine proposal?
Send your profile drawing or a photo of a sample panel, material type (PPGI, GI, Galvalume or black steel), thickness range, yield strength, coil width, required output per shift, and your local voltage and frequency. With these details our engineers can define the number of forming stations, roller material, cutting system and motor power.
Can XC build a roll forming machine for a local or non-standard profile?
Yes. Most XC machines are built to order. Our engineers develop the roll pass design (flower pattern) from your drawing or sample, so regional profiles such as IBR, Tuff-Rib, Klip-Lok style or Spanish-style tiles can be matched closely.
How is machine quality verified before shipment?
Every line is assembled and test-run in our factory with coil that matches your specification. Sample panels are measured against your drawing, and a trial-run video plus inspection photos are shared for your approval before packing.
What is the typical lead time for a roll forming machine?
Standard roofing sheet lines are commonly ready within 30 to 45 working days after drawing confirmation. Purlin, floor deck, double layer and fully customized lines may take longer. The confirmed schedule is stated in each proposal.
What after-sales support does XC provide to overseas buyers?
XC provides English manuals and electrical diagrams, remote video guidance for installation and commissioning, on-site engineer service on request, and spare parts supply such as blades, bearings and electrical components.
Can machines be configured for my local power supply?
Yes. Motors, hydraulic stations and control cabinets are configured to your site voltage and frequency, for example 220V, 380V, 415V or 440V at 50Hz or 60Hz, with HMI language options for operators. For Tokyo, the common configuration is 200 V/400 V class at 50 Hz.
How do you adapt a floor deck line for Tokyo 50 Hz power?
The proposal starts with the site’s actual supply. Motors, hydraulic power units, control transformers, inverters and safety circuits are selected for 50 Hz operation. The electrical diagram and component list should identify the supply assumptions so the buyer’s electrical contractor can verify them before installation.
What documents can be provided for a Tokyo compliance review?
Typical documents include the machine layout, electrical diagram, operation and maintenance manual, inspection record, trial-run report, sample-panel measurement sheet, spare-parts list and material or component certificates where available. Building permits, fire approvals and structural design remain the responsibility of the project’s licensed professionals; the machine supplier supports that review with equipment evidence.
How do you protect coating during roll forming?
Coating protection starts with roll pass design. Each pass should bend the strip gradually, avoid sharp pressure points and control edge strain. Roller surface finish, alignment, lubrication and strip tension also matter. Trial runs with the same coil family as the project are the best way to confirm that zinc and paint coatings remain intact.
Can you support installation and commissioning in Tokyo?
Yes, support can be structured as remote video guidance, an on-site engineer visit, or a combination of both. Export packing, foundation drawings, installation sequence, electrical checklists and operator training can be planned before shipment so that Tokyo site activities are coordinated with the buyer’s contractor.